When your column goes down, your plant goes down. TrayTec specializes in the installation of process internals in towers, reactors, and drums — from fractionation trays and structured packing to liquid distributors, mist eliminators, and phase separation equipment.

Tower internals work happens inside vessels. Our crews are IDLH-trained, confined-space-certified, and equipped with their own rescue teams. This means you never have to pause a job waiting on outside safety support. We treat every vessel entry as a critical operation.

.png)
A poorly leveled distributor or an out-of-spec tray installation kills column efficiency.Our supervisors are veterans who know the tolerances, follow the vendor drawings to the letter, and inspect at every step. QA is our primary focus.
.png)

From opening the manway to final torquing and closure inspection, TrayTec handles the full internal scope. Trays, packing, distributors, mist eliminators, feed devices & more. Fewer contractors means fewer scheduling conflicts and a faster turnaround.

.png)
TrayTec has been installing process internals since 2005. We've worked inside distillation columns, absorbers, strippers, fractionators, deethanizers, depropanizers, and glycol contactors across refineries, NGL plants, chemical facilities, and midstream processing units.
Our crews don't just show up with tools — they show up with the institutional knowledge that only comes from years of repetitioninside real vessels. That means reading vendor drawings on the fly, adapting to field conditions without stopping the clock, andflagging issues before they become shutdowns.
We operate across 40+ U.S. states and have completed international projects in South Africa, South America, and beyond. As anISNetworld, Avetta, and PEC compliant contractor; and a certified Minority Business Enterprise (MBE). We meet the prequalification requirements for major operators out of the gate.
Full installation of fractionation, high-performance, transition, and valve trays. Includes hardware assembly, levelingverification, downcomer clearance checks, and seal pan installation per vendor spec.
Installation of structured packing, blocksand, random dumped packing in-absorbers, strippers, and glycol-contactors. Includes pre-installation, inspection, bed loading to spec, and post-load verification.
Precision installation and leveling ofliquid distributor trays and collector traysabove packed beds. Our crews verifylevelness and flow uniformity beforeevery bed is loaded.
Installation of mesh mist eliminators,vane-type mist eliminators, anddemisting cyclones at tower outlets andvapor spaces to prevent liquid carryoverand protect downstream equipment.
Installation of feed pipe inlets, inlet-vane diffusers, inlet cyclones, and distribution baffles to control the vapor-liquid mixture entering the column and prevent maldistribution.
Installation of coalescers, hydrocyclones, demisting cyclones, screen cylinders, support grids, and sandjet systems inside separators, scrubbers, and knock-outdrums.
Tray cleaning, hardware replacement, downcomer repair, and on-site repairs during turnarounds and unplannedoutages. Also includes routine vessel inspections and nozzle installations.
Full blind-to-blind internal scope duringplanned turnarounds. From initial vessel opening, internal demolition and inspection, through reinstallation and final closure. Coordinated with your shutdown schedule.
Fill out this form in it's entirety, and our team will be in touch with you as soon as possible.
For faster service, give us a call during our business hours.